Efficient Filtering of Table Constraints with Reversible Sparse Bit-Sets

Efficient Filtering of Table Constraints with Reversible Sparse Bit-Sets

In this article, we explore how to divide a large train into smaller groups called unit trains and transport their cargo efficiently using dumpers, conveyors, and stackers. We break down the problem into simple steps and explain each one in detail, highlighting the key constraints that must be considered for successful completion. By understanding these concepts, readers can develop scheduling algorithms to minimize completion time and optimize train transportation operations.

Step 1: Split Big Train into Groups of Unit Trains

The first step is to divide the big train into smaller groups of unit trains. This process is like cutting a large cake into smaller pieces so that they can be handled more easily. The number of unit trains depends on the size of the big train and the desired division.

Step 2: Bring Unit Trains to Dumpers

Once the big train is divided into unit trains, they must be brought to the dumpers. These machines are like giant vacuum cleaners that suck up the cargo from the wagons and transfer it to conveyors. The dumpers can only accept some types of trains and materials, so this step is crucial in ensuring compatibility.

Step 3: Dump Cargo using Matching Conveyors and Dumpers

After reaching the dumpers, the unit trains must be unloaded onto matching conveyors. These conveyors are like long, winding roads that carry the cargo from the dumpers to the stackers. The conveyors must match the type of train and material being transported to ensure smooth transfer.
Step 4: Transport Cargo via Connected Conveyors to Stackers
Once the cargo is on the conveyors, it must be transported to the stackers. These machines are like tall, narrow buildings where the cargo is stored temporarily until it can be loaded onto trucks or trains for further transportation. The conveyors link the dumpers and stackers, creating a graph that represents the pathways between them.
Step 5: Pile Cargo on Valid Stockpiles using Available Stackers
The final step is to pile the cargo on valid stockpiles using available stackers. These machines are like tall, mechanical arms that can reach high into the sky and deposit the cargo onto designated areas. The stackers must follow a specific pattern to avoid overloading or damaging the cargo.

Objectives

The main objective of this problem is to minimize the completion time of the schedule. Depending on the client’s needs, additional objectives can be added, such as maximizing throughput during a given timeframe or minimizing waiting times for unit trains. These objectives will be considered in more complex versions of this problem.

Constraints

  1. Each train must be routed to the dumper that can accept it.
  2. Dumpers can only accept some types of trains and materials.
  3. Conveyors must match the type of train and material being transported.
  4. Stackers can only reach one or two stockpiles, depending on their size and location.
  5. Stockpiles have a maximum capacity for storing cargo, and each train can only be scheduled for one or two stockpiles.
  6. Stackers must follow a specific pattern to avoid overloading or damaging the cargo.
  7. The equipment flow of a train (dumper, conveyors, stacker) must be used for each train.
  8. Each train must be scheduled using an equipment flow.
    By understanding these concepts and constraints, readers can develop scheduling algorithms that efficiently transport cargo by dividing big trains into smaller unit trains, routing them to compatible dumpers, transferring the cargo onto conveyors, and piling it onto valid stockpiles using available stackers. This approach helps minimize completion time and optimize train transportation operations.